Working Bee #5

 

Home
Up
18:30 Weekend Away 2004
Construction #1
Construction #2
Construction #3
Construction #4
Construction #5
Construction #6
Construction #7
Cookbook
KYC 2004
MKC 2004
Official Opening
Senior Ladies' Fellowship
Temporary JJs Arrangements
Wall Hanging Kickoff
Wall Hanging #02
Wall Hanging #03
Working Bee #4
Working Bee #5
Working Bee #6
Working Bee #7
Working Bee #8
Working Bee #9
Working Bee #10
Mucking Around in Boats  

20/03/2004: Our 5th official Working Bee since the start of the redevelopment project saw many jobs completed in and around the Rectory. Nelly was on-hand to record the day in photographs.

Click on the small "thumbnail" photos to view the full sized image. Then use your browser's "Back" button to return to this page.

IMGP2176Peter  having a smashing time.JPG (48488 bytes) Peter Ballantyne gets to work dismantling the old kitchen cupboards.
IMGP2177It will have to go.JPG (51168 bytes) Peter clears out the cupboards from the old kitchen.

Dianna looks on as John Watson locates some buried pipes.

IMGP2179Finding pipes or treasures.JPG (91997 bytes)

Daryl and Sean dismantle the old Rectory Hills Hoist.

IMGP2180Washing line going.JPG (118937 bytes)
IMGP2181Smash that concrete.JPG (87905 bytes) Daryl and Siebe demolish the concrete path that lead to the old clothes line.
IMGP2182Doug makes a difference.JPG (60253 bytes) Doug removes mould and grime from the Rectory eves.

Michael excavates a trench to enable relocation of the Rectory back yard tap.

IMGP2183Michael smiling while digging.JPG (114812 bytes)

Patrick and Fiona tackling some of the overgrown shrubs at the front of the Rectory.

IMGP2186Patrick and Fiona tackling overgrowth.JPG (143036 bytes)
IMGP2187Doug at the ready.JPG (55581 bytes) Doug cleans the mould from the Rectory the porch at the Rectory front entrance.
IMGP2188Doug shows before and after.JPG (49180 bytes) Doug has cleaned away half of the mould. That's "before" on the left and "after" on the right.

Removal of the concrete base that supported the Hills Hoist proved to be a tough assignment.

IMGP2189washing line base is coming out.JPG (110192 bytes)

Already, Gordon has managed to park two of his vehicles in the new Rectory garage.

IMGP2193Ready for the race.JPG (50052 bytes)
IMGP2194Some more digging.JPG (116350 bytes) David and Peter dig a trench for a new water pipe.
IMGP2198Patrick not your arm.JPG (126612 bytes) Roy and Fiona assist Patrick to mulch the shrubbery pruned from the Rectory front yard.

Brian works with Doug to clean the eves.

IMGP2200Brian also cleaning the eaves.JPG (66215 bytes)

Morning tea.

IMGP2202A deserved break.JPG (61065 bytes)
IMGP2203Morning Tea great.JPG (47279 bytes) Workers consuming morning tea.
IMGP2208Drilling holes for the new washing line.JPG (47690 bytes) Sean prepares to install the new clothes line.

Judy refreshes Sean as he drills bolt holes for the new clothes line.

IMGP2209Who is the happy supervisor.JPG (86789 bytes)

Roy bundles up the pruned shrubs at the front of the Rectory.

IMGP2210Heaps for the mulcher.JPG (142800 bytes)
IMGP2214Well done we have washing lines.JPG (42957 bytes) The new clothes line installed in its retracted position. Inconspicuous and doesn't take up nearly as much room as a Hills Hoist.
[Next] 

Go to page [4] [6] [7] [8] [9] 

[Top]

[Home]

[Up]