Hole digger excavating
for the piers. |
 |
|
 |
Reinforcing to be used for
the concrete piers. |
|
|
 |
Driveway under construction
on the southern side of the existing church. |
|
Construction of the brick
wall which will line the driveway. |
 |
|
Last photo of the old
toilet block before demolition. The "porta-loos" in the
background will be used for the remainder of the construction period. |
 |
|
 |
The old toilet block,
mid-demolition. |
|
|
 |
Cylindrically formed
reinforcing to be used on the foundation piers. |
|
The first concrete to be
used on the site - footings for the new driveway. |
 |
|
Looking west down the
southern side of the existing church, where the new driveway will be
built. |
 |
|
 |
Fresh gravel for the gravel
pit. |
|
|
 |
Digging trenches for the new
sewer lines. |
|
The trench digger in
action. |
 |
|
Broad perspective of the
building site as it looked in January 2004. |
 |
|
 |
Old terracotta drainage
pipes removed during the sewer trench excavation. |
|
|
 |
Same scene as above, but 3
weeks later. Not much progress due to occasional rain that cannot drain
through the impervious clay. |
|
Late January, and the
reinforcing and other materials to be used in the footings and slab
begins to arrive. |
 |